Bornagar-Parbatipur-Katihar 765 kV Bangladesh-India Grid Interconnection Project (Bangladesh Part)
Objective(s)• To connect the huge hydroelectric potential of Bhutan and Arunachal Province to India through Bangladesh territory
• To draw 500-100MW power at Barapukuria from Cross Border Interconnection
Scope of Work1. 500MW HVDC Station at Barapukuria
2. 765kV double circuit transmission Line: 308 Ckt. Km
Project CostTotal: 411.60 mUSD
Financed by/DonorExpected from LOC-III.
Present StatusN/A
Estimated DurationN/A