South-West Grid Network Expansion Project (Phase-2)
Objective(s)•To meet the growing demand of Khulna & Barisal area.
•To enhance the power supply capacity & reliability of Khulna & Barisal Region
Scope of Work1. 400/132/33 kV: 1 no AIS (2x325MVA 400/132kV, 3x80/120 MVA 132/33kV)
2. 230/132/33 KV SS: 1 no (3x350/450, 2x80/120 MVA)
3. 132/33 kV SS: 4 nos(2x50/75 MVA Each) ,1 no (2x80/120MVA)
4. 230/132KV SS: 1 no GIS (230/33kV, 2x120/180 MVA)
5. 132/33 kV SS: 3 nosGIS (3x80/120 MVA Each)
6. 230 kV Line: 338Ckt. km.
7. 132 kV Line: 106 Ckt. Km.
8. 132kV line Strining:50 Ckt. Km
9. 230 kV Line: 212 Ckt. km.
10. 132 kV Line: 298 Ckt. Km.
11. 132 kV Line Stringing: 82 Ckt. km.
12. 230 kV bay extension: 4 no's
13. 132 kV Bay extension : 8 No's
Project CostTotal Cost : 210630.00 Lakh BDT
Financed by/DonorExpected from ADB.
Present StatusFeasibility Status is ongoing.
Estimated DurationJune, 2019 to July, 2023