Madunaghat - Maheskhali 765 kV Transmission Line Project
Objective(s)• To establish transmission infrastructure for evacuation of power to be generated from proposed power plants at Maheshkhali.
• To provide reliable power to all over the country.
Scope of Work1. 765 kV Line: 200 Ckt. Km
2. 400 kV bay extension at Madunaghat: 2 nos
Project CostTotal Cost : 267668.60 Lakh BDT
Financed by/DonorRequested from EDCF.
Present StatusPDPP was approved on 01/11/2015.
Estimated DurationJuly, 2019 to June, 2023