Aminbazar - Maowa - Mongla 400 KV Transmission Line Project
Objective(s)Main Objective: The main objective of the project is to create facilities to evacuate power from the upcoming Rampal Coal Power Plant.
Specific Objectives:
i. To establish a 400 kV transmission backbone line between Dhaka & Khulna Area.
ii. To construct river crossing line beside the Padma Bridge.
iii. To construct 400 kV AIS substation at Aminbazar.
Scope of Work1. Construction of Aminbazar - Maowa - Mongla 400 kV double circuit line (164.6 km)
2. Construction of river crossing line beside Padma Bridge (9.4 km)
3. Construction of substation (400 kV portion) at Aminbazar with 3x520 MVA transformers.
Project CostTotal: 135659.23 Lakh BDT GoB: 53838.12 Lakh BDT Project Aid: 66299.27 Lakh BDT (85.22 m USD) PGCB: 15521.84 Lakh BDT.
Financed by/DonorADB, GoB & PGCB
Present StatusPhysical : 17.68 %
Financial : 4.76 %

Estimated DurationJuly, 2016 to June, 2020
Project officeProject Director: Md. Abdul Monayem Chowdhury, Superintending Engineer
Address: Project-1, NLDC Complex, Aftabnagar, Badda, Dhaka.
Mobile: +88-01713-068-308\nTelephone: 02-9852662
E-mail: pgcbprojectone@yahoo.com