Amnura 132/33 kV Grid Substation with associated 132 kV Transmission Line Project.
Objective(s)To evacuate power from existing 50 MW and upcoming 100 MW power plants at Amnura and to meet the growing demand of Amnura area of Chapainawabganj district.
Scope of Work1. 132 kV single circuit pole line (Most of the Poles will be provided from PGCB store), from Rajshahi-Chapainawabganj 132 kV line (T connection at 1 km away from Chapainawabganj substation) to Amunra substation on single circuit pole line : 15 km (Single Grossbeak)
2. 132/33 kV AIS substation at Amnura (Chapainawabganj), Double Bus Scheme with 132/33 kV, 1 x 35/50 MVA 3-Phase transformer; 132 kV Line Bay: 4 nos. 132 kV Transformer Bay: 1 no.
132 kV Coupler Bay: 1 no. 33 kV Transformer Bay: 1 no.
Project CostTotal: BDT 91.6655 Crore Local Currency (LC): BDT 41.6391 crore; Foreign Currency (FC): BDT 50.0264 crore
Financed by/DonorPGCB
Present StatusPhysical : 97.71%
Financial : 64.93%
Estimated DurationJanuary, 2014 to June, 2019
Project officeProject Director: Bazlul Munir, Superintending Engineer
Address: House:06 (2nd Floor), Road:23/A, Gulshan-1, Dhaka-1212.
Mobile: +88-01714-041-412 (PD)
Telephone: 02-9891402
Fax: 02-9892975
E-mail: pd-astlp@pgcb.org.bd, astlp@pgcb.org.bd