400/230/132 kV Grid Network Development Project
Objective(s)i. To evacuate power from upcoming power plant at Ghorasal.
ii. To minimize the overloading of existing Tongi-Ghorasal 230 kV transmission line
iii. To meet up upcoming demand of Ullon and Dhanmondi area.
iv. To strengthen the power supply stability, reliability & transmission capability in Ullon, Dhanmondi as well as inner of Dhaka city.
v. To relieve the overloaded adjacent substations in different areas of the country
vi. To meet up upcoming demand of potential areas.
vii. To strengthen the power supply stability, reliability & transmission capability all over the country.
Scope of Work1. 230 kV GIS Switching Substation
2. 230/132 kV Substation (2x300 MVA): 3 nos.
230/132 kV Substation (3x300 MVA): 1 no
132/33 kV Substation (2x120 MVA): 1 no
132/33 kV Substation: 11 nos.
3. Construction of 400 kV double circuit line : 28 km
4. Construction of 132 kV line: 358 Ckt.km.
5. Construction of 230 kV line: 62.6 Ckt.km.
6. Re-conductoring of 230 kV line: 54 ckt.km
7. 132/33 kV SS Renovation: 3 nos.
8. 132 kV bay Extension: 4 nos.
9. 230 kV bay Extension: 6 nos.
Project CostTotal: BDT 322707.29 Lakh BDT GoB: BDT 46957.22 Lakh BDT Project Aid: BDT 233816.40 Lakh BDT (300 m USD) PGCB: BDT 41933.67 Lakh BDT
Financed by/DonorIDB, ADB, GoB & PGCB
Present StatusPhysical : 67.70 %
Financial : 21.42 %

Estimated DurationJuly, 2013 to June, 2019
Project officeProject Director:Md. Ohiduzzaman, Chief Engineer
Address:NLDC Bhaban, 7th floor, Aftabnagar, PGCB, Dhaka-1212.
Mobile:Md. Ohiduzzaman (CE & PD) :+88-01711-648-109;
Sanjit Kumar Saha (SE & DPD-1) : 01777743221;
Md. SirajulHaque (SE & DPD-2) : 01787680500;
E-mail:Md. Ohiduzzaman (CE & PD) : ce-gndp@pgcb.org.bd
Sanjit Kumar Saha (SE & DPD-1) : dpd1-gndp@pgcb.org.bd
Md. SirajulHaque (SE & DPD-2) : dpd2-gndp@pgcb.org.bd