Enhancement of Capacity of Grid Substations and Transmission Lines for Rural Electrification.
Objective(s)i. To enhance the capacity of existing 132/33 kV substation;
ii. To increase reliability of power supply at Dhaka area and
iii. Renovation /Up-gradation of some existing transmission lines.
Scope of Work1. 132 kV double circuit line : 40 km
2. 132 kV single circuit line on double circuit tower : 60 km
3. 230 kV double circuit In-Out Line at proposed 230/132/33 kV Substation : 1 km
4. Four circuit Interconnecting 132kV line with existing line to connect proposed 230/132/33 kV Substation : 3.5 km
5. 132 kV Double Circuit In-Out Line at proposed 132/33 kV Substation : 2 km
6. Existing 132 kV Four Circuit Line Re-routing at new 230/132 kV Substation : 2 km
7. 230/132/33 kV Substation with 3x300 MVA transformer and 2x75 MVA transformers
8. 132/33 kV substation with 2×75 MVA transformer
9. 132/33 kV substation with 2×41 MVA transformer: 3 nos.
10. 132/33 kV substation with 2×75 MVA transformer
11. 2x75 MVA 3 phase power transformer at 132/33 kV Substation: 5 nos.
12. Re-conductoring of 132 kV double circuit line : 229 km
13. 132 kV single circuit stringing of existing 132 kV line : 51 km
14. Bay Extension : 6 nos.
Project CostTotal: 107970.46 Lakh BDT GoB: 14692.33 Lakh BDT Project Aid: 77468.33 Lakh BDT PGCB: 15809.80 Lakh BDT
Development PartnerWorld Bank
Present StatusPhysical: 95.28 %
Financial: 77.04%


Estimated DurationJuly, 2014 to December, 2019
Project officeProject Director: Mohammad Shahid Hossain, Superintending Engineer
Address: 80, Mohakhali C/A (1st Floor), Dhaka.
Mobile: +88-01713-069-186
Telephone: 9859626, 9861492
E-mail: pd-ecgstlp@pgcb.org.bd