Enhancement and Strengthening of Power Network in Eastern Region
Objective(s)The main objective of the project is to meet up the growing demand by ensuring reliable power supply to industrial, commercial and residential points of Greater Comilla, Chittagong, Greater Noakhali area by enhancing & strengthening existing grid network of Eastern Region.
Scope of Work1. 400 kV Transmission Lines: 12.63 km
2. 230 kV Transmission Lines: 175.91 km
3. 132 kV Transmission Lines: 256.3 km including 157 km reconductoring
4. 400 kV Substations: 2 nos
5. 230 kV Substations: 2 nos.
6. 132 kV Substations: 10 nos.
7. Bay Extensions: 6 nos.
8. Improved Maintenance and Management System.
Project CostTotal: 580393.83 Lakh BDT GOB: 168338.43 Lakh BDT PA : 364248.35 Lakh BDT PGCB: 47807.04 Lakh BDT
Financed by/DonorWorld Bank
Present StatusPhysical : 1.00%
Financial : 0.00%
Estimated DurationJanuary, 2018 to December, 2021
Project officeProject Director : A.K.M. Gause Mohiuddin Ahmed, Superintending Engineer
Project Office : NLDC Building (5th Floor), Aftabnagar, Dhaka-1212
Mobile : 01713032702
Email : pd-wgndp@pgcb.org.bd