NLDC (National Load Dispatch Centre) Project
Objective(s)a) To establish a centralized coordination among generation, transmission & distribution of the exixting power system.
b) To operate each power station & substation at an economically profitable unit.
c) To reduce operational loss.
d) To save the electrical motors from being burntout due to excessive variation in voltage &frequency.
e)To improve communication between all the electrical installations in the existing power system through modern SCADA techniques &Communication network.
Scope of Work• SCADA System
• Energy Management System (EMS)
• Communication System
Project CostTotal: 421.68 crore BDT, GOB: 143.95 crore BDT, Project Aid: 277.73 crore BDT
Development PartnerADB, GOB
Completion Date2003-04 to 2009-10